Rate 22 – Large Volume Interruptible Transportation Service
This rate is for customers who use more than 12,000 GJ per month and have the ability to switch to an alternate energy source.
Interruption of service due to operational or weather related system constraints is at Terasen Gas' discretion and the customer can be required to stop using natural gas with a minimum of 2 hours notice.
The rate structure consists of fixed and variable charges.
Fixed charges
The two fixed monthly charges are independent of the volume of gas used each month:
- a basic charge, and
- an administration charge.
Variable charges
There are variable charges for the delivery (also called transportation) of each GJ of gas consumed. These charges are based on a minimum invoiced volume of 12,000 GJ per month whether the gas is consumed or not.
Rate 22 is authorized by written contract with Terasen Gas, and specific terms and conditions may apply.
Note: Customers have a separate gas commodity contract with their chosen gas marketer.